**# Major Developments** - Version 3 of Boukili is finalized; testing is about to start. - The “set‑focus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby. - ONFR live‑feed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification. - A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR. - OTT search‑result ranking changes have been made; final sign‑off is pending completion of device testing (including Apple TV zoom). - Boukili will run on a dedicated VM long‑term; the planned API integration is postponed. **# Risks / Blockers** - Unclear compatibility of Storyline “set‑focus” with JAWS may delay its future product inclusion. - CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders. - Variable episode lengths (30 min first, 20‑28 min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required. - Subtitles for test videos are not displaying, likely due to missing collection association. - JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed. - No identified staging server for supervision‑solution testing; reliance on simulation could hide production issues. - Access to Boukili’s production database and Contentful API configuration remain unresolved, blocking full integration. - Podcast automation still depends on connecting to the Jira API. **# Decisions Made** - Do not retro‑fit existing work to immediately include the Storyline feature; keep it on standby until screen‑reader compatibility is verified. - Use the Haywire feed for ONFR testing; defer a second Chorus URL. - Deploy the job‑supervision checks first on ONFR, then later on Idéllo and TFO after successful tests. - Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast. - Maintain manual activation/deactivation of the test feed for now (no full automation). - Preserve Boukili on a VM; postpone API development. - Use engaged‑view metrics for YouTube performance reporting to retain historical comparability. **# Decisions Needed** - Clarify with Pierre‑Olivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report. - Confirm JWP’s ingest‑point behavior and any associated billing for the secondary feed. - Determine whether a second Chorus URL will ever be purchased for live feed use. - Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador). - Approve the Jira‑form design for automated podcast‑chain requests after feasibility confirmation with Marc. **# Project Changes** - Boukili version 3 testing schedule initiated; OTT and other dossiers to be followed up. - ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern. - Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints. - OTT testing expanded to include multiple devices and Apple TV zoom verification before sign‑off. **# Vendor Issues** - Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP. - Need clarification from JWP on ingest‑point operation, fee structure, and stream handling. **# Team / Coaching / Recognition** - No explicit coaching or recognition items recorded in the notes. **# Next‑Week Commitments** - Send email to CRTC and follow up with Pierre‑Olivier on the report clarification. - Begin version 3 Boukili testing. - Conduct end‑to‑end test with broadcast studio (start 10 h, live at 10:10 h, 10‑min video). - Implement cron checks on ONFR and add supervision entries. - Create a test collection in JWP and verify subtitle display. - Verify JWP secondary‑feed billing and ingest‑point details. - Complete mapping of Boukili production‑DB fields after migration. - Obtain “is original” product indicator data from Louise team for reporting. **# Sources** - **Work/Team/Valery/Valery 1‑1/2026‑09‑08 - Valery - Amadou.md** — Storyline feature, CRTC issue, Boukili v3 status. - **Work/Projects/2026/ONFR/2026‑09‑08 - Ai Rei et Moi.md** — Haywire feed decision, episode duration handling, subtitle issue. - **Work/Projects/2026/ONFR/2026‑09‑08 - Direct ONFR - Point du feed pour le Live Event.md** — JWP feed strategy, ingest/fee clarification, subtitle collection test. - **Work/Team/Slimane/Slimane 1‑1/2026‑09‑08 - Mohammed Slimane- Amadou.md** — Job supervision solution approval and rollout plan. - **Work/Team/Jean‑Claude/Jean‑Claude 1‑1/2026‑09‑08 - Jean‑Claude - Amadou.md** — JWP feed details, OTT testing, Contentful API, podcast automation. - **Work/Team/Habiba/Habiba 1‑1/2026‑09‑08 - Habiba 1‑1.md** — Boukili VM decision, production DB access, YouTube engaged‑view metric, ONFR live‑ON OTT data tracking.