**# Major Developments**
- Version3 of Boukili is finalized; testing is about to start.
- The “setfocus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby.
- ONFR livefeed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification.
- A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR.
- OTT searchresult ranking changes have been made; final signoff is pending completion of device testing (including AppleTV zoom).
- Boukili will run on a dedicated VM longterm; the planned API integration is postponed.
**# Risks / Blockers**
- Unclear compatibility of Storyline “setfocus” with JAWS may delay its future product inclusion.
- CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders.
- Variable episode lengths (30min first, 2028min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required.
- Subtitles for test videos are not displaying, likely due to missing collection association.
- JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed.
- No identified staging server for supervisionsolution testing; reliance on simulation could hide production issues.
- Access to Boukilis production database and Contentful API configuration remain unresolved, blocking full integration.
- Podcast automation still depends on connecting to the Jira API.
**# Decisions Made**
- Do not retrofit existing work to immediately include the Storyline feature; keep it on standby until screenreader compatibility is verified.
- Use the Haywire feed for ONFR testing; defer a second Chorus URL.
- Deploy the jobsupervision checks first on ONFR, then later on Idéllo and TFO after successful tests.
- Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast.
- Maintain manual activation/deactivation of the test feed for now (no full automation).
- Preserve Boukili on a VM; postpone API development.
- Use engagedview metrics for YouTube performance reporting to retain historical comparability.
**# Decisions Needed**
- Clarify with PierreOlivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report.
- Confirm JWPs ingestpoint behavior and any associated billing for the secondary feed.
- Determine whether a second Chorus URL will ever be purchased for live feed use.
- Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador).
- Approve the Jiraform design for automated podcastchain requests after feasibility confirmation with Marc.
**# Project Changes**
- Boukili version3 testing schedule initiated; OTT and other dossiers to be followed up.
- ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern.
- Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints.
- OTT testing expanded to include multiple devices and AppleTV zoom verification before signoff.
**# Vendor Issues**
- Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP.
- Need clarification from JWP on ingestpoint operation, fee structure, and stream handling.
**# Team / Coaching / Recognition**
- No explicit coaching or recognition items recorded in the notes.
**# NextWeek Commitments**
- Send email to CRTC and follow up with PierreOlivier on the report clarification.
- Begin version3 Boukili testing.
- Conduct endtoend test with broadcast studio (start 10h, live at 10:10h, 10min video).
- Implement cron checks on ONFR and add supervision entries.
- Create a test collection in JWP and verify subtitle display.
- Verify JWP secondaryfeed billing and ingestpoint details.
- Complete mapping of Boukili productionDB fields after migration.
- Obtain “is original” product indicator data from Louise team for reporting.
**# Sources**
- **Work/Team/Valery/Valery11/20260908 - Valery - Amadou.md** — Storyline feature, CRTC issue, Boukiliv3 status.
- **Work/Projects/2026/ONFR/20260908 - Ai Rei et Moi.md** — Haywire feed decision, episode duration handling, subtitle issue.
- **Work/Projects/2026/ONFR/20260908 - Direct ONFR - Point du feed pour le Live Event.md** — JWP feed strategy, ingest/fee clarification, subtitle collection test.
- **Work/Team/Slimane/Slimane11/20260908 - Mohammed Slimane- Amadou.md** — Job supervision solution approval and rollout plan.
- **Work/Team/JeanClaude/JeanClaude11/20260908 - JeanClaude - Amadou.md** — JWP feed details, OTT testing, Contentful API, podcast automation.
- **Work/Team/Habiba/Habiba11/20260908 - Habiba11.md** — Boukili VM decision, production DB access, YouTube engagedview metric, ONFR liveONOTT data tracking.