vault backup: 2026-09-11 20:58:40

This commit is contained in:
2026-09-11 20:58:40 -04:00
parent edfce9159a
commit 8a304759ef
12 changed files with 1861 additions and 63 deletions
@@ -0,0 +1,65 @@
**# Major Developments**
- The planned production release for the FirebasetoAWS migration (Boukili) scheduled for Monday was cancelled; no new release date will be set until blockers are clarified and reliable estimates obtained. (Source: *20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md*)
- A “freeze” of code will occur once the currently identified issues are fixed and validated; phase2 work will be kept on a separate branch and not merged into phase1 during validation. (Source: *20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md*)
- The OTT delivery is at risk of missing the liveevent deadline (Sept14) due to regressions; a weekend release may be required to meet the Sept17 live broadcast. (Source: *20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md*)
**# Risks / Blockers**
- Potential loss or nonsynchronisation of user data for multidevice users during the FirebasetoAWS migration; risk heightened if devices remain on different backends. (Source: *Boukili.md*)
- Ongoing Salesforce regression investigation with no resolution at time of meeting; impacts data migration reliability. (Source: *Boukili.md*)
- Uncertainty about the reliability of the data migration itself; current suggested solutions (accepting data loss or reduced reliability) are not acceptable. (Source: *Boukili.md*)
- Insufficient testing time to guarantee a solid version before submission; migration works on test/staging but fails on UAT. (Source: *Produit Numérique.md*)
- “Last activity” field reliability issues, especially under network failure conditions. (Source: *Produit Numérique.md*)
- Undefined strategy for forced migration of multidevice users; critical for submission. (Source: *Produit Numérique.md*)
- QA capacity bottleneck: only one QA resource covering four sites; risk of delayed testing. (Source: *Reunion equipe.md*)
- JW Player billing ambiguity: unclear whether fees apply to active address or actual stream usage. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Decisions Made**
- Cancelled Monday production release for Boukili migration; defer new date pending clarification. (Source: *Boukili.md*)
- Code freeze to be applied after fixing and validating identified issues; phase2 work isolated on separate branch. (Source: *Produit Numérique.md*)
- Use the second Corus feed for a test send to JW Player; keep existing feed unchanged; retain both ingest points and request JW Player to delete those that cannot be removed directly. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Documentation departmental will be presented under “platform” section; data governance treated as continuous practice; project renamed “projet Données FMC”. (Source: *Reunion equipe.md*)
- For Idéllo ZIP files, each course/ZIP must have its own Jira ticket; processing will not start before 12Oct. (Source: *Reunion equipe.md*)
**# Decisions Needed**
- Confirmation of the migrationforced strategy for multidevice users and associated user communication plan. (Source: *Produit Numérique.md*)
- Final delivery date and freeze trigger confirmation for the upcoming release (window18Sept  23Sept). (Source: *Produit Numérique.md*)
- Clarification of JW Player billing conditions (address active vs. stream usage). (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Approval of additional QA resources or temporary reinforcement to address capacity bottleneck. (Source: *Reunion equipe.md*)
**# Project Changes**
- Production schedule for Boukili migration postponed; new schedule pending resolution of datamigration blockers. (Source: *Boukili.md*)
- OTT delivery timeline now uncertain; may require weekend release to meet live event on 17Sept. (Source: *Reunion equipe.md*)
- Phase2 development work will be isolated on a separate branch, not merged into phase1 during validation. (Source: *Produit Numérique.md*)
**# Vendor Issues**
- JW Player billing details remain contradictory; need clarification from vendor. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Coordination with Corus (contact Chris Sandinot) required to modify second stream address for test. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Team / Coaching / Recognition**
- No explicit coaching or recognition items identified in the notes.
**# NextWeek Commitments**
- Technical point with Abiba to clarify datamigration issues (deadline: tomorrow morning). (Source: *Boukili.md*)
- Prepare and circulate email detailing critical blockers for team validation. (Source: *Boukili.md*)
- Evaluate feasibility, cost, and timeline of IBO intervention on migration with The Mind (starting after tomorrows point). (Source: *Boukili.md*)
- Inform Mohamed of the release postponement after clarification with Abiba. (Source: *Boukili.md*)
- Obtain duration estimates for resolving remaining problems (responsible: The Mind). (Source: *Boukili.md*)
- Investigate UAT migration issue and deliver a stable version after a new test cycle (development team). (Source: *Produit Numérique.md*)
- Implement retry mechanism for “last activity” field and set up visibility indicator for tests (development team). (Source: *Produit Numérique.md*)
- Exchange with Habiba to define robust solution for validating last activity (responsible: relevant teams). (Source: *Produit Numérique.md*)
- Study with current agency the possibility of forcing all users to update via Contentful message (Amadou & team). (Source: *Produit Numérique.md*)
- Verify Salesforce test progress with Nicolas and Mark; communicate update (responsible: relevant team). (Source: *Produit Numérique.md*)
- Confirm realistic delivery dates by email (development team, due afternoon). (Source: *Produit Numérique.md*)
- Prepare project presentation for meeting with Francis (due Tuesday15Sept). (Source: *Reunion equipe.md*)
- Continue Umami tracker implementation (JeanClaude). (Source: *Reunion equipe.md*)
- Analyze Mogador sync flows and set up failure alerts (Mohamed Slimane). (Source: *Reunion equipe.md*)
- Create Jira tickets for each Idéllo ZIP file/course starting 12Oct (Jason & requestors). (Source: *Reunion equipe.md*)
- Perform targeted regression tests on TFO live/carousel delivery before 1617Sept (Ajar). (Source: *Reunion equipe.md*)
- Conduct exchange on servicetracking recommendations for MAMI (Rabiba & Amandou). (Source: *Reunion equipe.md*)
- Test second Corus feed to JW Player and report results (responsible not specified). (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Sources**
- 20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md — production release cancellation, blockers, actions.
- 20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md — code freeze, delivery window, risks.
- 20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md — OTT delivery risk, Boukili migration complexity, QA capacity, project naming, Idéllo ZIP process.
- 20 Work/Projects/2026/OTT/2026-09-10 - Direct ONFR - Réponse sur le feed de JWP.md — JW Player feed test, billing ambiguity.