Files
SecondBrain/.weekly-review-tmp/week-37-groq/evidence-01.md
T

65 lines
5.3 KiB
Markdown
Raw Blame History

This file contains invisible Unicode characters
This file contains invisible Unicode characters that are indistinguishable to humans but may be processed differently by a computer. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
**# Major Developments**
- Version3 of Boukili is finalized; testing is about to start.
- The “setfocus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby.
- ONFR livefeed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification.
- A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR.
- OTT searchresult ranking changes have been made; final signoff is pending completion of device testing (including AppleTV zoom).
- Boukili will run on a dedicated VM longterm; the planned API integration is postponed.
**# Risks / Blockers**
- Unclear compatibility of Storyline “setfocus” with JAWS may delay its future product inclusion.
- CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders.
- Variable episode lengths (30min first, 2028min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required.
- Subtitles for test videos are not displaying, likely due to missing collection association.
- JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed.
- No identified staging server for supervisionsolution testing; reliance on simulation could hide production issues.
- Access to Boukilis production database and Contentful API configuration remain unresolved, blocking full integration.
- Podcast automation still depends on connecting to the Jira API.
**# Decisions Made**
- Do not retrofit existing work to immediately include the Storyline feature; keep it on standby until screenreader compatibility is verified.
- Use the Haywire feed for ONFR testing; defer a second Chorus URL.
- Deploy the jobsupervision checks first on ONFR, then later on Idéllo and TFO after successful tests.
- Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast.
- Maintain manual activation/deactivation of the test feed for now (no full automation).
- Preserve Boukili on a VM; postpone API development.
- Use engagedview metrics for YouTube performance reporting to retain historical comparability.
**# Decisions Needed**
- Clarify with PierreOlivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report.
- Confirm JWPs ingestpoint behavior and any associated billing for the secondary feed.
- Determine whether a second Chorus URL will ever be purchased for live feed use.
- Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador).
- Approve the Jiraform design for automated podcastchain requests after feasibility confirmation with Marc.
**# Project Changes**
- Boukili version3 testing schedule initiated; OTT and other dossiers to be followed up.
- ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern.
- Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints.
- OTT testing expanded to include multiple devices and AppleTV zoom verification before signoff.
**# Vendor Issues**
- Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP.
- Need clarification from JWP on ingestpoint operation, fee structure, and stream handling.
**# Team / Coaching / Recognition**
- No explicit coaching or recognition items recorded in the notes.
**# NextWeek Commitments**
- Send email to CRTC and follow up with PierreOlivier on the report clarification.
- Begin version3 Boukili testing.
- Conduct endtoend test with broadcast studio (start 10h, live at 10:10h, 10min video).
- Implement cron checks on ONFR and add supervision entries.
- Create a test collection in JWP and verify subtitle display.
- Verify JWP secondaryfeed billing and ingestpoint details.
- Complete mapping of Boukili productionDB fields after migration.
- Obtain “is original” product indicator data from Louise team for reporting.
**# Sources**
- **Work/Team/Valery/Valery11/20260908 - Valery - Amadou.md** — Storyline feature, CRTC issue, Boukiliv3 status.
- **Work/Projects/2026/ONFR/20260908 - Ai Rei et Moi.md** — Haywire feed decision, episode duration handling, subtitle issue.
- **Work/Projects/2026/ONFR/20260908 - Direct ONFR - Point du feed pour le Live Event.md** — JWP feed strategy, ingest/fee clarification, subtitle collection test.
- **Work/Team/Slimane/Slimane11/20260908 - Mohammed Slimane- Amadou.md** — Job supervision solution approval and rollout plan.
- **Work/Team/JeanClaude/JeanClaude11/20260908 - JeanClaude - Amadou.md** — JWP feed details, OTT testing, Contentful API, podcast automation.
- **Work/Team/Habiba/Habiba11/20260908 - Habiba11.md** — Boukili VM decision, production DB access, YouTube engagedview metric, ONFR liveONOTT data tracking.