Weekly Evidence Pack


# Major Developments

  • Version3 of Boukili is finalized; testing is about to start.
  • The “setfocus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby.
  • ONFR livefeed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification.
  • A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR.
  • OTT searchresult ranking changes have been made; final signoff is pending completion of device testing (including AppleTV zoom).
  • Boukili will run on a dedicated VM longterm; the planned API integration is postponed.

# Risks / Blockers

  • Unclear compatibility of Storyline “setfocus” with JAWS may delay its future product inclusion.
  • CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders.
  • Variable episode lengths (30min first, 2028min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required.
  • Subtitles for test videos are not displaying, likely due to missing collection association.
  • JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed.
  • No identified staging server for supervisionsolution testing; reliance on simulation could hide production issues.
  • Access to Boukilis production database and Contentful API configuration remain unresolved, blocking full integration.
  • Podcast automation still depends on connecting to the Jira API.

# Decisions Made

  • Do not retrofit existing work to immediately include the Storyline feature; keep it on standby until screenreader compatibility is verified.
  • Use the Haywire feed for ONFR testing; defer a second Chorus URL.
  • Deploy the jobsupervision checks first on ONFR, then later on Idéllo and TFO after successful tests.
  • Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast.
  • Maintain manual activation/deactivation of the test feed for now (no full automation).
  • Preserve Boukili on a VM; postpone API development.
  • Use engagedview metrics for YouTube performance reporting to retain historical comparability.

# Decisions Needed

  • Clarify with PierreOlivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report.
  • Confirm JWPs ingestpoint behavior and any associated billing for the secondary feed.
  • Determine whether a second Chorus URL will ever be purchased for live feed use.
  • Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador).
  • Approve the Jiraform design for automated podcastchain requests after feasibility confirmation with Marc.

# Project Changes

  • Boukili version3 testing schedule initiated; OTT and other dossiers to be followed up.
  • ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern.
  • Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints.
  • OTT testing expanded to include multiple devices and AppleTV zoom verification before signoff.

# Vendor Issues

  • Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP.
  • Need clarification from JWP on ingestpoint operation, fee structure, and stream handling.

# Team / Coaching / Recognition

  • No explicit coaching or recognition items recorded in the notes.

# NextWeek Commitments

  • Send email to CRTC and follow up with PierreOlivier on the report clarification.
  • Begin version3 Boukili testing.
  • Conduct endtoend test with broadcast studio (start 10h, live at 10:10h, 10min video).
  • Implement cron checks on ONFR and add supervision entries.
  • Create a test collection in JWP and verify subtitle display.
  • Verify JWP secondaryfeed billing and ingestpoint details.
  • Complete mapping of Boukili productionDB fields after migration.
  • Obtain “is original” product indicator data from Louise team for reporting.

# Sources

  • Work/Team/Valery/Valery11/20260908 - Valery - Amadou.md — Storyline feature, CRTC issue, Boukiliv3 status.
  • Work/Projects/2026/ONFR/20260908 - Ai Rei et Moi.md — Haywire feed decision, episode duration handling, subtitle issue.
  • Work/Projects/2026/ONFR/20260908 - Direct ONFR - Point du feed pour le Live Event.md — JWP feed strategy, ingest/fee clarification, subtitle collection test.
  • Work/Team/Slimane/Slimane11/20260908 - Mohammed Slimane- Amadou.md — Job supervision solution approval and rollout plan.
  • Work/Team/JeanClaude/JeanClaude11/20260908 - JeanClaude - Amadou.md — JWP feed details, OTT testing, Contentful API, podcast automation.
  • Work/Team/Habiba/Habiba11/20260908 - Habiba11.md — Boukili VM decision, production DB access, YouTube engagedview metric, ONFR liveONOTT data tracking.

# Major Developments

  • Decision to keep WordPress on the current site and retain WP Engine as the hosting provider. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Established process for publishing course ZIP files to Idéllo: a ticket must be created, the ZIP prepared, and then handed to Hélène for injection into Louise; implementation cannot start before12Oct. (Source: 20260910 Flux Zip pour les maleos qui vont sur Idello.md)
  • Approval from the CTO to present a potential collaboration with Lunii to the CEO, with a view to opening an exploratory discussion. (Source: 20260911 Présenter Luuni à Xavier.md)
  • Planned dedicated meeting on16Sept afternoon to discuss the Mogador projects synchronization evolution and possible removal. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)

# Risks / Blockers

  • Geoblocking of TFO and Idéllo cannot be temporarily removed without a production release; raises legal issues for international distribution. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • CRTC accessibility remarks lack detail; need clarification of confidentiality vs. anonymity before the5Oct deadline. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Mogador synchronization complexity, potential removal, and lack of a clear “source of truth” for data. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Dependency on USbased vendors (JWP, WP Engine, Algolia) poses compliance risk under current policy. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Applications built with Gemini or via vibe coding could be deployed without sufficient visibility on design, security, or maintenance. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • OTT test completion is required before any store publication; delay could impact launch schedule. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Limited time (≈1.5days) to implement and validate four technical items for the Boukili build; risk of P3/P4 bugs remaining unresolved. (Source: Daily Meeting TFO vs Zemind.md)

# Decisions Made

  • Remain on WordPress for the site and keep WP Engine as the host. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • ZIPtoIdéllo workflow: ticket → ZIP preparation → handoff to Hélène; start no earlier than12Oct. (Source: 20260910 Flux Zip pour les maleos qui vont sur Idello.md)
  • Unblock Trings invoice now that the deliverable has been provided. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Organize dedicated meetings for complex topics rather than bundling many items in a single session. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)

# Decisions Needed

  • Confirmation of which of the four technical subjects (retry of lastactivity tracking, Firebase auth lockout, updatemessage migration, Contentful version control) will be included in the next build for Boukili. (Source: Daily Meeting TFO vs Zemind.md)
  • Final determination on Mogadors synchronization approach and whether the project will be removed. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Clarification of CRTC accessibility requirements and confidentiality handling before5Oct. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Decision on proceeding with the Lunii exploratory contact after CEO review. (Source: 20260911 Présenter Luuni à Xavier.md)

# Project Changes

  • Scheduled dedicated Mogador discussion onWednesday16Sept afternoon. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Planned presentation of projects with Francis and team for the following week. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Production build for Boukili to be released as a release candidate the day after the QAvalidated build. (Source: Daily Meeting TFO vs Zemind.md)

# Vendor Issues

  • Ongoing compliance review of USbased vendors (JWP, WP Engine, Algolia) due to policy constraints. (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Trings regression requires review of Algolia logic; pending email from JC. (Source: 20260910 Journal.md and 20260911 Journal.md)

# Team / Coaching / Recognition

  • No explicit coaching or recognition entries meet the extraction criteria. (No applicable source content.)

# NextWeek Commitments

  • Prepare and deliver the ZIPtoIdéllo workflow ticket (start12Oct). (Source: 20260910 Flux Zip pour les maleos qui vont sur Idello.md)
  • Conduct the dedicated Mogador meeting (Wed16Sept afternoon). (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Present project overview with Francis to the teams (next week). (Source: Mohammed B 11/20260908 Amadou - Mohammed.md)
  • Validate and deploy the production build for Boukili, including passwordreset testing. (Source: Daily Meeting TFO vs Zemind.md)

# Sources

  • Mohammed B 11/20260908 Amadou - Mohammed.md — major project decisions, risks, actions, and upcoming meetings.
  • 20260910 Flux Zip pour les maleos qui vont sur Idello.md — ZIP publishing decision and timeline.
  • 20260911 Présenter Luuni à Xavier.md — CTOapproved Lunii collaboration proposal.
  • Daily Meeting TFO vs Zemind.md — Boukili build schedule, technical blockers, and pending decisions.
  • 20260910 Journal.md — notes on OTT testing and Trings/Algolia issues.
  • 20260911 Journal.md — additional Trings regression details.

# Major Developments

  • The planned production release for the FirebasetoAWS migration (Boukili) scheduled for Monday was cancelled; no new release date will be set until blockers are clarified and reliable estimates obtained. (Source: 20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md)
  • A “freeze” of code will occur once the currently identified issues are fixed and validated; phase2 work will be kept on a separate branch and not merged into phase1 during validation. (Source: 20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md)
  • The OTT delivery is at risk of missing the liveevent deadline (Sept14) due to regressions; a weekend release may be required to meet the Sept17 live broadcast. (Source: 20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md)

# Risks / Blockers

  • Potential loss or nonsynchronisation of user data for multidevice users during the FirebasetoAWS migration; risk heightened if devices remain on different backends. (Source: Boukili.md)
  • Ongoing Salesforce regression investigation with no resolution at time of meeting; impacts data migration reliability. (Source: Boukili.md)
  • Uncertainty about the reliability of the data migration itself; current suggested solutions (accepting data loss or reduced reliability) are not acceptable. (Source: Boukili.md)
  • Insufficient testing time to guarantee a solid version before submission; migration works on test/staging but fails on UAT. (Source: Produit Numérique.md)
  • “Last activity” field reliability issues, especially under network failure conditions. (Source: Produit Numérique.md)
  • Undefined strategy for forced migration of multidevice users; critical for submission. (Source: Produit Numérique.md)
  • QA capacity bottleneck: only one QA resource covering four sites; risk of delayed testing. (Source: Reunion equipe.md)
  • JW Player billing ambiguity: unclear whether fees apply to active address or actual stream usage. (Source: Direct ONFR - Réponse sur le feed de JWP.md)

# Decisions Made

  • Cancelled Monday production release for Boukili migration; defer new date pending clarification. (Source: Boukili.md)
  • Code freeze to be applied after fixing and validating identified issues; phase2 work isolated on separate branch. (Source: Produit Numérique.md)
  • Use the second Corus feed for a test send to JW Player; keep existing feed unchanged; retain both ingest points and request JW Player to delete those that cannot be removed directly. (Source: Direct ONFR - Réponse sur le feed de JWP.md)
  • Documentation departmental will be presented under “platform” section; data governance treated as continuous practice; project renamed “projet Données FMC”. (Source: Reunion equipe.md)
  • For Idéllo ZIP files, each course/ZIP must have its own Jira ticket; processing will not start before 12Oct. (Source: Reunion equipe.md)

# Decisions Needed

  • Confirmation of the migrationforced strategy for multidevice users and associated user communication plan. (Source: Produit Numérique.md)
  • Final delivery date and freeze trigger confirmation for the upcoming release (window18Sept  23Sept). (Source: Produit Numérique.md)
  • Clarification of JW Player billing conditions (address active vs. stream usage). (Source: Direct ONFR - Réponse sur le feed de JWP.md)
  • Approval of additional QA resources or temporary reinforcement to address capacity bottleneck. (Source: Reunion equipe.md)

# Project Changes

  • Production schedule for Boukili migration postponed; new schedule pending resolution of datamigration blockers. (Source: Boukili.md)
  • OTT delivery timeline now uncertain; may require weekend release to meet live event on 17Sept. (Source: Reunion equipe.md)
  • Phase2 development work will be isolated on a separate branch, not merged into phase1 during validation. (Source: Produit Numérique.md)

# Vendor Issues

  • JW Player billing details remain contradictory; need clarification from vendor. (Source: Direct ONFR - Réponse sur le feed de JWP.md)
  • Coordination with Corus (contact Chris Sandinot) required to modify second stream address for test. (Source: Direct ONFR - Réponse sur le feed de JWP.md)

# Team / Coaching / Recognition

  • No explicit coaching or recognition items identified in the notes.

# NextWeek Commitments

  • Technical point with Abiba to clarify datamigration issues (deadline: tomorrow morning). (Source: Boukili.md)
  • Prepare and circulate email detailing critical blockers for team validation. (Source: Boukili.md)
  • Evaluate feasibility, cost, and timeline of IBO intervention on migration with The Mind (starting after tomorrows point). (Source: Boukili.md)
  • Inform Mohamed of the release postponement after clarification with Abiba. (Source: Boukili.md)
  • Obtain duration estimates for resolving remaining problems (responsible: The Mind). (Source: Boukili.md)
  • Investigate UAT migration issue and deliver a stable version after a new test cycle (development team). (Source: Produit Numérique.md)
  • Implement retry mechanism for “last activity” field and set up visibility indicator for tests (development team). (Source: Produit Numérique.md)
  • Exchange with Habiba to define robust solution for validating last activity (responsible: relevant teams). (Source: Produit Numérique.md)
  • Study with current agency the possibility of forcing all users to update via Contentful message (Amadou & team). (Source: Produit Numérique.md)
  • Verify Salesforce test progress with Nicolas and Mark; communicate update (responsible: relevant team). (Source: Produit Numérique.md)
  • Confirm realistic delivery dates by email (development team, due afternoon). (Source: Produit Numérique.md)
  • Prepare project presentation for meeting with Francis (due Tuesday15Sept). (Source: Reunion equipe.md)
  • Continue Umami tracker implementation (JeanClaude). (Source: Reunion equipe.md)
  • Analyze Mogador sync flows and set up failure alerts (Mohamed Slimane). (Source: Reunion equipe.md)
  • Create Jira tickets for each Idéllo ZIP file/course starting 12Oct (Jason & requestors). (Source: Reunion equipe.md)
  • Perform targeted regression tests on TFO live/carousel delivery before 1617Sept (Ajar). (Source: Reunion equipe.md)
  • Conduct exchange on servicetracking recommendations for MAMI (Rabiba & Amandou). (Source: Reunion equipe.md)
  • Test second Corus feed to JW Player and report results (responsible not specified). (Source: Direct ONFR - Réponse sur le feed de JWP.md)

# Sources

  • 20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md — production release cancellation, blockers, actions.
  • 20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md — code freeze, delivery window, risks.
  • 20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md — OTT delivery risk, Boukili migration complexity, QA capacity, project naming, Idéllo ZIP process.
  • 20 Work/Projects/2026/OTT/2026-09-10 - Direct ONFR - Réponse sur le feed de JWP.md — JW Player feed test, billing ambiguity.