Files
SecondBrain/.weekly-review-tmp/week-37-evidence.md
T

193 lines
18 KiB
Markdown
Raw Blame History

This file contains invisible Unicode characters
This file contains invisible Unicode characters that are indistinguishable to humans but may be processed differently by a computer. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Evidence Pack
---
**# Major Developments**
- Version3 of Boukili is finalized; testing is about to start.
- The “setfocus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby.
- ONFR livefeed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification.
- A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR.
- OTT searchresult ranking changes have been made; final signoff is pending completion of device testing (including AppleTV zoom).
- Boukili will run on a dedicated VM longterm; the planned API integration is postponed.
**# Risks / Blockers**
- Unclear compatibility of Storyline “setfocus” with JAWS may delay its future product inclusion.
- CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders.
- Variable episode lengths (30min first, 2028min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required.
- Subtitles for test videos are not displaying, likely due to missing collection association.
- JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed.
- No identified staging server for supervisionsolution testing; reliance on simulation could hide production issues.
- Access to Boukilis production database and Contentful API configuration remain unresolved, blocking full integration.
- Podcast automation still depends on connecting to the Jira API.
**# Decisions Made**
- Do not retrofit existing work to immediately include the Storyline feature; keep it on standby until screenreader compatibility is verified.
- Use the Haywire feed for ONFR testing; defer a second Chorus URL.
- Deploy the jobsupervision checks first on ONFR, then later on Idéllo and TFO after successful tests.
- Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast.
- Maintain manual activation/deactivation of the test feed for now (no full automation).
- Preserve Boukili on a VM; postpone API development.
- Use engagedview metrics for YouTube performance reporting to retain historical comparability.
**# Decisions Needed**
- Clarify with PierreOlivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report.
- Confirm JWPs ingestpoint behavior and any associated billing for the secondary feed.
- Determine whether a second Chorus URL will ever be purchased for live feed use.
- Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador).
- Approve the Jiraform design for automated podcastchain requests after feasibility confirmation with Marc.
**# Project Changes**
- Boukili version3 testing schedule initiated; OTT and other dossiers to be followed up.
- ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern.
- Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints.
- OTT testing expanded to include multiple devices and AppleTV zoom verification before signoff.
**# Vendor Issues**
- Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP.
- Need clarification from JWP on ingestpoint operation, fee structure, and stream handling.
**# Team / Coaching / Recognition**
- No explicit coaching or recognition items recorded in the notes.
**# NextWeek Commitments**
- Send email to CRTC and follow up with PierreOlivier on the report clarification.
- Begin version3 Boukili testing.
- Conduct endtoend test with broadcast studio (start 10h, live at 10:10h, 10min video).
- Implement cron checks on ONFR and add supervision entries.
- Create a test collection in JWP and verify subtitle display.
- Verify JWP secondaryfeed billing and ingestpoint details.
- Complete mapping of Boukili productionDB fields after migration.
- Obtain “is original” product indicator data from Louise team for reporting.
**# Sources**
- **Work/Team/Valery/Valery11/20260908 - Valery - Amadou.md** — Storyline feature, CRTC issue, Boukiliv3 status.
- **Work/Projects/2026/ONFR/20260908 - Ai Rei et Moi.md** — Haywire feed decision, episode duration handling, subtitle issue.
- **Work/Projects/2026/ONFR/20260908 - Direct ONFR - Point du feed pour le Live Event.md** — JWP feed strategy, ingest/fee clarification, subtitle collection test.
- **Work/Team/Slimane/Slimane11/20260908 - Mohammed Slimane- Amadou.md** — Job supervision solution approval and rollout plan.
- **Work/Team/JeanClaude/JeanClaude11/20260908 - JeanClaude - Amadou.md** — JWP feed details, OTT testing, Contentful API, podcast automation.
- **Work/Team/Habiba/Habiba11/20260908 - Habiba11.md** — Boukili VM decision, production DB access, YouTube engagedview metric, ONFR liveONOTT data tracking.
---
**# Major Developments**
- Decision to keep WordPress on the current site and retain WP Engine as the hosting provider. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Established process for publishing course ZIP files to Idéllo: a ticket must be created, the ZIP prepared, and then handed to Hélène for injection into Louise; implementation cannot start before12Oct. (Source: *20260910 Flux Zip pour les maleos qui vont sur Idello.md*)
- Approval from the CTO to present a potential collaboration with Lunii to the CEO, with a view to opening an exploratory discussion. (Source: *20260911 Présenter Luuni à Xavier.md*)
- Planned dedicated meeting on16Sept afternoon to discuss the Mogador projects synchronization evolution and possible removal. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
**# Risks / Blockers**
- Geoblocking of TFO and Idéllo cannot be temporarily removed without a production release; raises legal issues for international distribution. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- CRTC accessibility remarks lack detail; need clarification of confidentiality vs. anonymity before the5Oct deadline. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Mogador synchronization complexity, potential removal, and lack of a clear “source of truth” for data. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Dependency on USbased vendors (JWP, WP Engine, Algolia) poses compliance risk under current policy. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Applications built with Gemini or via vibe coding could be deployed without sufficient visibility on design, security, or maintenance. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- OTT test completion is required before any store publication; delay could impact launch schedule. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Limited time (≈1.5days) to implement and validate four technical items for the Boukili build; risk of P3/P4 bugs remaining unresolved. (Source: *Daily Meeting TFO vs Zemind.md*)
**# Decisions Made**
- Remain on WordPress for the site and keep WP Engine as the host. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- ZIPtoIdéllo workflow: ticket → ZIP preparation → handoff to Hélène; start no earlier than12Oct. (Source: *20260910 Flux Zip pour les maleos qui vont sur Idello.md*)
- Unblock Trings invoice now that the deliverable has been provided. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Organize dedicated meetings for complex topics rather than bundling many items in a single session. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
**# Decisions Needed**
- Confirmation of which of the four technical subjects (retry of lastactivity tracking, Firebase auth lockout, updatemessage migration, Contentful version control) will be included in the next build for Boukili. (Source: *Daily Meeting TFO vs Zemind.md*)
- Final determination on Mogadors synchronization approach and whether the project will be removed. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Clarification of CRTC accessibility requirements and confidentiality handling before5Oct. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Decision on proceeding with the Lunii exploratory contact after CEO review. (Source: *20260911 Présenter Luuni à Xavier.md*)
**# Project Changes**
- Scheduled dedicated Mogador discussion onWednesday16Sept afternoon. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Planned presentation of projects with Francis and team for the following week. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Production build for Boukili to be released as a release candidate the day after the QAvalidated build. (Source: *Daily Meeting TFO vs Zemind.md*)
**# Vendor Issues**
- Ongoing compliance review of USbased vendors (JWP, WP Engine, Algolia) due to policy constraints. (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Trings regression requires review of Algolia logic; pending email from JC. (Source: *20260910 Journal.md* and *20260911 Journal.md*)
**# Team / Coaching / Recognition**
- No explicit coaching or recognition entries meet the extraction criteria. (No applicable source content.)
**# NextWeek Commitments**
- Prepare and deliver the ZIPtoIdéllo workflow ticket (start12Oct). (Source: *20260910 Flux Zip pour les maleos qui vont sur Idello.md*)
- Conduct the dedicated Mogador meeting (Wed16Sept afternoon). (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Present project overview with Francis to the teams (next week). (Source: *Mohammed B 11/20260908 Amadou - Mohammed.md*)
- Validate and deploy the production build for Boukili, including passwordreset testing. (Source: *Daily Meeting TFO vs Zemind.md*)
**# Sources**
- *Mohammed B 11/20260908 Amadou - Mohammed.md* — major project decisions, risks, actions, and upcoming meetings.
- *20260910 Flux Zip pour les maleos qui vont sur Idello.md* — ZIP publishing decision and timeline.
- *20260911 Présenter Luuni à Xavier.md* — CTOapproved Lunii collaboration proposal.
- *Daily Meeting TFO vs Zemind.md* — Boukili build schedule, technical blockers, and pending decisions.
- *20260910 Journal.md* — notes on OTT testing and Trings/Algolia issues.
- *20260911 Journal.md* — additional Trings regression details.
---
**# Major Developments**
- The planned production release for the FirebasetoAWS migration (Boukili) scheduled for Monday was cancelled; no new release date will be set until blockers are clarified and reliable estimates obtained. (Source: *20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md*)
- A “freeze” of code will occur once the currently identified issues are fixed and validated; phase2 work will be kept on a separate branch and not merged into phase1 during validation. (Source: *20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md*)
- The OTT delivery is at risk of missing the liveevent deadline (Sept14) due to regressions; a weekend release may be required to meet the Sept17 live broadcast. (Source: *20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md*)
**# Risks / Blockers**
- Potential loss or nonsynchronisation of user data for multidevice users during the FirebasetoAWS migration; risk heightened if devices remain on different backends. (Source: *Boukili.md*)
- Ongoing Salesforce regression investigation with no resolution at time of meeting; impacts data migration reliability. (Source: *Boukili.md*)
- Uncertainty about the reliability of the data migration itself; current suggested solutions (accepting data loss or reduced reliability) are not acceptable. (Source: *Boukili.md*)
- Insufficient testing time to guarantee a solid version before submission; migration works on test/staging but fails on UAT. (Source: *Produit Numérique.md*)
- “Last activity” field reliability issues, especially under network failure conditions. (Source: *Produit Numérique.md*)
- Undefined strategy for forced migration of multidevice users; critical for submission. (Source: *Produit Numérique.md*)
- QA capacity bottleneck: only one QA resource covering four sites; risk of delayed testing. (Source: *Reunion equipe.md*)
- JW Player billing ambiguity: unclear whether fees apply to active address or actual stream usage. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Decisions Made**
- Cancelled Monday production release for Boukili migration; defer new date pending clarification. (Source: *Boukili.md*)
- Code freeze to be applied after fixing and validating identified issues; phase2 work isolated on separate branch. (Source: *Produit Numérique.md*)
- Use the second Corus feed for a test send to JW Player; keep existing feed unchanged; retain both ingest points and request JW Player to delete those that cannot be removed directly. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Documentation departmental will be presented under “platform” section; data governance treated as continuous practice; project renamed “projet Données FMC”. (Source: *Reunion equipe.md*)
- For Idéllo ZIP files, each course/ZIP must have its own Jira ticket; processing will not start before 12Oct. (Source: *Reunion equipe.md*)
**# Decisions Needed**
- Confirmation of the migrationforced strategy for multidevice users and associated user communication plan. (Source: *Produit Numérique.md*)
- Final delivery date and freeze trigger confirmation for the upcoming release (window18Sept  23Sept). (Source: *Produit Numérique.md*)
- Clarification of JW Player billing conditions (address active vs. stream usage). (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Approval of additional QA resources or temporary reinforcement to address capacity bottleneck. (Source: *Reunion equipe.md*)
**# Project Changes**
- Production schedule for Boukili migration postponed; new schedule pending resolution of datamigration blockers. (Source: *Boukili.md*)
- OTT delivery timeline now uncertain; may require weekend release to meet live event on 17Sept. (Source: *Reunion equipe.md*)
- Phase2 development work will be isolated on a separate branch, not merged into phase1 during validation. (Source: *Produit Numérique.md*)
**# Vendor Issues**
- JW Player billing details remain contradictory; need clarification from vendor. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
- Coordination with Corus (contact Chris Sandinot) required to modify second stream address for test. (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Team / Coaching / Recognition**
- No explicit coaching or recognition items identified in the notes.
**# NextWeek Commitments**
- Technical point with Abiba to clarify datamigration issues (deadline: tomorrow morning). (Source: *Boukili.md*)
- Prepare and circulate email detailing critical blockers for team validation. (Source: *Boukili.md*)
- Evaluate feasibility, cost, and timeline of IBO intervention on migration with The Mind (starting after tomorrows point). (Source: *Boukili.md*)
- Inform Mohamed of the release postponement after clarification with Abiba. (Source: *Boukili.md*)
- Obtain duration estimates for resolving remaining problems (responsible: The Mind). (Source: *Boukili.md*)
- Investigate UAT migration issue and deliver a stable version after a new test cycle (development team). (Source: *Produit Numérique.md*)
- Implement retry mechanism for “last activity” field and set up visibility indicator for tests (development team). (Source: *Produit Numérique.md*)
- Exchange with Habiba to define robust solution for validating last activity (responsible: relevant teams). (Source: *Produit Numérique.md*)
- Study with current agency the possibility of forcing all users to update via Contentful message (Amadou & team). (Source: *Produit Numérique.md*)
- Verify Salesforce test progress with Nicolas and Mark; communicate update (responsible: relevant team). (Source: *Produit Numérique.md*)
- Confirm realistic delivery dates by email (development team, due afternoon). (Source: *Produit Numérique.md*)
- Prepare project presentation for meeting with Francis (due Tuesday15Sept). (Source: *Reunion equipe.md*)
- Continue Umami tracker implementation (JeanClaude). (Source: *Reunion equipe.md*)
- Analyze Mogador sync flows and set up failure alerts (Mohamed Slimane). (Source: *Reunion equipe.md*)
- Create Jira tickets for each Idéllo ZIP file/course starting 12Oct (Jason & requestors). (Source: *Reunion equipe.md*)
- Perform targeted regression tests on TFO live/carousel delivery before 1617Sept (Ajar). (Source: *Reunion equipe.md*)
- Conduct exchange on servicetracking recommendations for MAMI (Rabiba & Amandou). (Source: *Reunion equipe.md*)
- Test second Corus feed to JW Player and report results (responsible not specified). (Source: *Direct ONFR - Réponse sur le feed de JWP.md*)
**# Sources**
- 20 Work/Projects/2026/Boukili/2026-09-10 - Boukili.md — production release cancellation, blockers, actions.
- 20 Work/Meetings/TFO/Produits Numériques (Transversal)/2026-09-11 - Produit Numérique.md — code freeze, delivery window, risks.
- 20 Work/Meetings/Team Meetings/2026/2026-09-10 - Reunion equipe.md — OTT delivery risk, Boukili migration complexity, QA capacity, project naming, Idéllo ZIP process.
- 20 Work/Projects/2026/OTT/2026-09-10 - Direct ONFR - Réponse sur le feed de JWP.md — JW Player feed test, billing ambiguity.