5.3 KiB
5.3 KiB
# Major Developments
- Version 3 of Boukili is finalized; testing is about to start.
- The “set‑focus” trigger feature in Storyline is ready but its compatibility with JAWS screen readers is still unknown; the feature will remain on standby.
- ONFR live‑feed implementation: Haywire feed will be used for tests; a second Chorus URL is not being pursued pending cost clarification.
- A supervision solution for background jobs (cron checks with URL health, notifications on critical state changes) has been approved for phased rollout, starting with ONFR.
- OTT search‑result ranking changes have been made; final sign‑off is pending completion of device testing (including Apple TV zoom).
- Boukili will run on a dedicated VM long‑term; the planned API integration is postponed.
# Risks / Blockers
- Unclear compatibility of Storyline “set‑focus” with JAWS may delay its future product inclusion.
- CRTC report request lacks clarity on retroactivity, required content, and publication location; the exact response already sent is not known to all stakeholders.
- Variable episode lengths (30 min first, 20‑28 min thereafter) risk incorrect automatic stop of JWP recording; manual intervention may be required.
- Subtitles for test videos are not displaying, likely due to missing collection association.
- JWP ingest point behavior, possible fees for the secondary feed, and overall documentation are not confirmed.
- No identified staging server for supervision‑solution testing; reliance on simulation could hide production issues.
- Access to Boukili’s production database and Contentful API configuration remain unresolved, blocking full integration.
- Podcast automation still depends on connecting to the Jira API.
# Decisions Made
- Do not retro‑fit existing work to immediately include the Storyline feature; keep it on standby until screen‑reader compatibility is verified.
- Use the Haywire feed for ONFR testing; defer a second Chorus URL.
- Deploy the job‑supervision checks first on ONFR, then later on Idéllo and TFO after successful tests.
- Keep the JWP 24/7 feed unchanged; manage the secondary test feed manually via Wirecast.
- Maintain manual activation/deactivation of the test feed for now (no full automation).
- Preserve Boukili on a VM; postpone API development.
- Use engaged‑view metrics for YouTube performance reporting to retain historical comparability.
# Decisions Needed
- Clarify with Pierre‑Olivier and the CRTC exactly what modifications (retroactivity, location, inclusion of response) are required for the CRTC report.
- Confirm JWP’s ingest‑point behavior and any associated billing for the secondary feed.
- Determine whether a second Chorus URL will ever be purchased for live feed use.
- Decide the final content handling after ONFR live events (retain JWP stream vs. replace with main version in Louise/Magador).
- Approve the Jira‑form design for automated podcast‑chain requests after feasibility confirmation with Marc.
# Project Changes
- Boukili version 3 testing schedule initiated; OTT and other dossiers to be followed up.
- ONFR episode preparation shifted to “prepare Wednesday, publish Thursday” cadence; three initial episodes to follow this pattern.
- Supervision solution rollout timeline: ONFR → Idéllo → TFO, with testing checkpoints.
- OTT testing expanded to include multiple devices and Apple TV zoom verification before sign‑off.
# Vendor Issues
- Potential surfacturation of the secondary JWP feed (active for at least four months) pending verification with JWP.
- Need clarification from JWP on ingest‑point operation, fee structure, and stream handling.
# Team / Coaching / Recognition
- No explicit coaching or recognition items recorded in the notes.
# Next‑Week Commitments
- Send email to CRTC and follow up with Pierre‑Olivier on the report clarification.
- Begin version 3 Boukili testing.
- Conduct end‑to‑end test with broadcast studio (start 10 h, live at 10:10 h, 10‑min video).
- Implement cron checks on ONFR and add supervision entries.
- Create a test collection in JWP and verify subtitle display.
- Verify JWP secondary‑feed billing and ingest‑point details.
- Complete mapping of Boukili production‑DB fields after migration.
- Obtain “is original” product indicator data from Louise team for reporting.
# Sources
- Work/Team/Valery/Valery 1‑1/2026‑09‑08 - Valery - Amadou.md — Storyline feature, CRTC issue, Boukili v3 status.
- Work/Projects/2026/ONFR/2026‑09‑08 - Ai Rei et Moi.md — Haywire feed decision, episode duration handling, subtitle issue.
- Work/Projects/2026/ONFR/2026‑09‑08 - Direct ONFR - Point du feed pour le Live Event.md — JWP feed strategy, ingest/fee clarification, subtitle collection test.
- Work/Team/Slimane/Slimane 1‑1/2026‑09‑08 - Mohammed Slimane- Amadou.md — Job supervision solution approval and rollout plan.
- Work/Team/Jean‑Claude/Jean‑Claude 1‑1/2026‑09‑08 - Jean‑Claude - Amadou.md — JWP feed details, OTT testing, Contentful API, podcast automation.
- Work/Team/Habiba/Habiba 1‑1/2026‑09‑08 - Habiba 1‑1.md — Boukili VM decision, production DB access, YouTube engaged‑view metric, ONFR live‑ON OTT data tracking.